Home / Business & Management / DMAIC and Waste

Lean Six Sigma · 8 Essential Terms

Lean Six Sigma Flashcards: DMAIC, 5S, Kaizen, Poka-Yoke, and the Eight Wastes (2026)

Lean Six Sigma core language for career exams and operations interviews: DMAIC versus DMADV, CTQ, defects, 5S, kaizen, poka-yoke, value-stream maps, and the eight wastes.

Confirm items against the current ASCM or PMI content outline. This desk is an independent study aid and is not an official item bank.

Study desk

DMAIC

The improvement cycle: Define, Measure, Analyze, Improve, and Control. It improves an existing process rather than designing a new one.

Flip cards, the timed match, and the quiz open in this panel. The full glossary below is ready either way.

Full glossary

Every term, pronunciation, definition, memory hook, and exam trap is written out here so you can review the whole set or print it.

DMAIC

duh-MAY-ik

The improvement cycle: Define, Measure, Analyze, Improve, and Control. It improves an existing process rather than designing a new one.

Mnemonic. DMAIC fixes a process that already exists. DMADV designs a new one.

Exam trap. If the process does not exist yet, DMAIC is the wrong cycle. Design work points to DMADV: Define, Measure, Analyze, Design, Verify.

CTQ

see tee kyoo

Critical to quality: a measurable characteristic that the customer uses, explicitly or not, to judge whether the output is acceptable.

Mnemonic. CTQ is the customer's must, stated so it can be measured.

Exam trap. A CTQ written only in internal jargon the customer would not recognize is the trap. Translate the voice of the customer into a specification you can measure.

Defect

DEE-fekt

An output that fails to meet a customer requirement or a specification. In Six Sigma math, defect opportunities are counted against units.

Mnemonic. A defect is a broken promise to the requirement, not a broken feeling about the process.

Exam trap. Do not count a rework loop as zero defects because the customer eventually received a good unit. The internal failure still happened.

5S

five es

A workplace discipline: Sort, Set in order, Shine, Standardize, and Sustain. The point is a stable, visible process, not a one-day cleanup.

Mnemonic. 5S is five habits. Without Sustain, the other four were a Saturday.

Exam trap. Stopping after the cleanup photo is the trap. Standardize and Sustain are the exam's way of asking whether the improvement will exist next month.

Kaizen

KY-zen

Continuous improvement through small, ongoing changes made by the people who do the work. A kaizen event focuses that habit into a short, intense workshop.

Mnemonic. Kaizen is the small step you keep. A radical rebuild has a different name.

Exam trap. A multimillion-dollar system replacement is not a kaizen. Call it what it is. The exam uses kaizen for incremental, participative improvement.

Poka-yoke

POH-kah YOH-kay

Mistake-proofing: designing the process or the fixture so the error is prevented or is instantly obvious. A checklist can help; a physical interlock is the stronger form.

Mnemonic. Poka-yoke makes the wrong move hard or impossible, instead of asking people to try harder.

Exam trap. Training alone is not poka-yoke. If the same error is still easy to make, the design has not changed.

Value Stream Map

VAL-yoo streem map

A map of the flow of material and information required to deliver a product or service, separating value-added time from waiting and other waste.

Mnemonic. The value stream map shows the waits between the work, not only the work.

Exam trap. A process flowchart of one department is not a value stream map. The map has to cross the handoffs and show information flow and time.

Eight Wastes

ayt waysts

A lean list of muda, remembered as TIMWOODS: transportation, inventory, motion, waiting, overproduction, over-processing, defects, and non-utilized talent.

Mnemonic. TIMWOODS: the waste is not only scrap. Excess inventory and unused skill count too.

Exam trap. Overproduction is the waste that feeds the others, not a sign of a healthy buffer. The trap is defending a large finished-goods pile as lean because the line never stops.

Browse Exams by Category

Popular Exam Paths